Embassy of India Thimphu,Bhutan

Official Emblem of India

Embassy of India

Thimphu

  • Accessibility Tools

Menu
  • Home
  • About Us
    • About Embassy
      • Ambassador
      • Previous Ambassadors
      • Officers
      • List of Holidays 2026 bullet
      • Office Timings
    • Consulate General of India,Phuentsholing bullet
    • India House Eco Park
    • Right to Information
  • India - Bhutan Relations
    • India-Bhutan Relations
    • High-Level Visits to Bhutan
    • High-Level Visits to India
      • Visit of His Majesty The King of Bhutan to India
      • Visit of Prime Minister of Bhutan to India
    • List of treaty agreements and MoUs
    • Picture gallery - High level exchanges between India and Bhutan
  • Consular Matters
    • Emergency Contact Number
    • Consular Timings and Contacts
    • Info for Indian Nationals entering Bhutan
    • Bhutanese Nationals entering India
    • Consular Services
    • Passport Services
    • Visa Services for third country nationals
    • Overseas Citizenship of India Cards
      • Guidelines on the reissuance of OCI Cards bullet
    • Indian Community Welfare Fund
      • Revised ICWF charges w.e.f 01 April 2025 bullet
    • Ban on use of Thuraya/Irridium Satellite phone in India
    • Overseas Voters
      • How to enrol as an Overseas/NRI Elector bullet
      • National Voters' Service Portal bullet
      • Brochure for Overseas Electors bullet
      • Brochure for Service Voters bullet
    • FAQ for marital disputes, afterlife remains
      • 1.FAQ on marital disputes involving NRI/PIO spouses
      • 2.e-Clearance for Afterlife Remains (eCARe) portal
  • Development Partnership
    • Development Plan Assistance
    • Hydropower Projects
    • Implementation of 13th FYP
      • Table of Releases
      • Press Releases on Activities
  • Education and Training
    • Education
    • Training
  • Economic and Commercial
    • India-Bhutan Trade Relations
    • Procedure for filing trade complaints
    • Details of Indian and Bhutanese Business Chambers / Associations
  • Media Center
    • Bhutan in MEA Annual Report
    • Mission's Videos
    • Press Release
    • Speeches by Ambassador
    • India in Bhutanese media
    • Photo Gallery
    • Glimpses of Activity in EOI Thimphu
    • Tenders
    • Archive Tenders
    • India@75 Amrit Mahotsav
  • Culture
    • India-Bhutan Foundation bullet
    • Nehru-Wangchuck Cultural Centre
  • Contact us
Search
Press Release Archives Press Release Archives
  • Home > Press Release Archives > Press Release: Signing of Concession Agreement for 600 MW Kholongchhu Hydroelectric Project in Bhutan

Press Release: Signing of Concession Agreement for 600 MW Kholongchhu Hydroelectric Project in Bhutan

Press Release

Signing of Concession Agreement for 600 MW Kholongchhu Hydroelectric Project in Bhutan

June 29, 2020

The Concession Agreement for the 600 MW Kholongchhu (Joint Venture) Hydroelectric Project between the Royal Government of Bhutan and Kholongchhu Hydro Energy Limited was signed on 29 June 2020 in Thimphu, in the presence of Dr. S. Jaishankar, External Affairs Minister, Government of India and Lyonpo Dr. Tandi Dorji, Foreign Minister, Royal Government of Bhutan. Lyonpo Loknath Sharma, Minister of Economic Affairs, Royal Government of Bhutan and senior government officials including Foreign Secretaries of India and Bhutan, Secretary (Power), GoI, Ambassador of India to Bhutan and Ambassador of Bhutan to India were also present at signing ceremony, which was held through video conferencing.

2. The 600 MW run-of-the-river project is located on the lower course of the Kholongchhu River in Trashiyangtse District in Eastern Bhutan. The Project envisages an underground powerhouse of four 150 MW turbines with water impounded by a concrete gravity dam of 95 meters height. It will be implemented by Kholongchhu Hydro Energy Limited, a Joint Venture company formed between Druk Green Power Corporation (DGPC) of Bhutan and Satluj Jal Vidyut Nigam Limited (SJVNL) of India. The signing of the Concession Agreement will lead to commencement of construction and other works of this first Joint Venture Hydroelectric Project between India and Bhutan. The project is expected to be completed in the second half of 2025.

3. Both the External Affairs Minister of India and Foreign Minister of Bhutan emphasized the importance of hydro power development as an important pillar of mutually beneficial bilateral economic cooperation. They also recalled the trust, co-operation and mutual respect that have long characterized the unique and special friendship, anchored in mutual understanding and reinforced by a shared cultural heritage and strong people to people links between India and Bhutan.

4. Hydropower sector is the flagship area of India-Bhutan bilateral cooperation. The 720 MW Mangdechhu hydroelectric project was jointly inaugurated earlier in August 2019 by the Hon’ble Prime Ministers of India and Bhutan. With this, four (04) hydroelectric projects of bilateral cooperation (336 MW Chukha HEP, 60 MW Kurichhu HEP, 1020 MW Tala HEP and 720 MW Mangdechhu HEP), totaling over 2100 MW, are already operational in Bhutan.

29 June 2020
New Delhi

image image image image image image image image image image
  • Terms & Conditions
  • Privacy Policy
  • Copyright Policy
  • Hyperlinking Policy
  • Accessibility Statement
  • Help
  • Safe to Host
twitter Facebook YouTube Instagram

Embassy of India Thimphu, Bhutan All Rights Reserved.

Visitors : 7901520   |    Page last updated on November 16, 2026


Powered by: Ardhas Technology India Private Limited.