Embassy of India Thimphu,Bhutan

Official Emblem of India

Embassy of India

Thimphu

  • Accessibility Tools

Menu
  • Home
  • About Us
    • About Embassy
      • Ambassador
      • Previous Ambassadors
      • Officers
      • List of Holidays 2026 bullet
      • Office Timings
    • Consulate General of India,Phuentsholing bullet
    • India House Eco Park
    • Right to Information
  • India - Bhutan Relations
    • India-Bhutan Relations
    • High-Level Visits to Bhutan
    • High-Level Visits to India
      • Visit of His Majesty The King of Bhutan to India
      • Visit of Prime Minister of Bhutan to India
    • List of treaty agreements and MoUs
    • Picture gallery - High level exchanges between India and Bhutan
  • Consular Matters
    • Emergency Contact Number
    • Consular Timings and Contacts
    • Info for Indian Nationals entering Bhutan
    • Bhutanese Nationals entering India
    • Consular Services
    • Passport Services
    • Visa Services for third country nationals
    • Overseas Citizenship of India Cards
      • Guidelines on the reissuance of OCI Cards bullet
    • Indian Community Welfare Fund
      • Revised ICWF charges w.e.f 01 April 2025 bullet
    • Ban on use of Thuraya/Irridium Satellite phone in India
    • Overseas Voters
      • How to enrol as an Overseas/NRI Elector bullet
      • National Voters' Service Portal bullet
      • Brochure for Overseas Electors bullet
      • Brochure for Service Voters bullet
    • FAQ for marital disputes, afterlife remains
      • 1.FAQ on marital disputes involving NRI/PIO spouses
      • 2.e-Clearance for Afterlife Remains (eCARe) portal
  • Development Partnership
    • Development Plan Assistance
    • Hydropower Projects
    • Implementation of 13th FYP
      • Table of Releases
      • Press Releases on Activities
  • Education and Training
    • Education
    • Training
  • Economic and Commercial
    • India-Bhutan Trade Relations
    • Procedure for filing trade complaints
    • Details of Indian and Bhutanese Business Chambers / Associations
  • Media Center
    • Bhutan in MEA Annual Report
    • Mission's Videos
    • Press Release
    • Speeches by Ambassador
    • India in Bhutanese media
    • Photo Gallery
    • Glimpses of Activity in EOI Thimphu
    • Tenders
    • Archive Tenders
    • India@75 Amrit Mahotsav
  • Culture
    • India-Bhutan Foundation bullet
    • Nehru-Wangchuck Cultural Centre
  • Contact us
Search
What's New What's New
  • Home > What's New > 19th Monthly Coordination Meeting on India’s support for the 13th Five Year Plan

19th Monthly Coordination Meeting on India’s support for the 13th Five Year Plan

The 19th Monthly Coordination Meeting between Embassy of India (EoI), Thimphu and  Royal Government of Bhutan (RGoB) on cooperation under Bhutan’s 13th Five Year Plan was held today. Deputy Chief of Mission, Embassy of India, Thimphu and Director General, Department of Macro-Fiscal and Development Finance (DMDF), Ministry of Finance, RGoB participated together with officials from the Indian Embassy and RGoB ministries and agencies.

2. The Indian side handed over cheques amounting to INR/Nu. 2.90 billion (290 crores) to Ministry of Finance, RGoB, towards Government of India’s commitment under Bhutan’s 13th Five Year Plan for the following projects:

(i) Development of Quality and fit-for-purpose Infrastructure for RUB Colleges: INR/Nu. 632.5 million (63.25 crores). [The total project cost is INR/Nu. 1.91 billion (191 crores).]

(ii) Human Resource Development and Skilling Programmes: INR/Nu. 492.4 million (49.24 crores). [The total project cost is INR/Nu. 1.77 billion (177 crores).]

(iii) Professional Development and Immersion/Exchange Programmes for Teachers, Education Leaders and Students: INR/Nu. 357.3 million (35.73 crores). [The total project cost is INR/Nu. 1.69 billion (169 crores).]

(iv) Safeguarding Crop Protection through Chain-Link Fencing (Phase-II): INR/Nu. 250 million (25 crores) for constructing 60 chain-link fencing projects of total length  of399 km across 19 Dzongkhags in Bhutan. The total project cost is INR/Nu. 500 million (50 crores). Separately, under its phase-I, 193 chain-link projects of total length 1042 km across all 20 Dzongkhags at a total project cost of INR/Nu. 1.5 billion (150 crores) have been completed or under implementation.

(v) Redevelopment of the Phuentsholing Sports Association (PSA) Ground under Phuentsholing Thromde Enhancement Program (PTEP): INR/Nu. 148.9 million (14.89 crores). [The total project cost is INR/Nu. 231 million (23.1 crores).]

(vi) Establishment of National Weather and Flood Warning Centre (NWFWC) and Scientific Facilities, Thimphu: INR/Nu. 99 million (9.9 crores), which will include a 24X7 National Weather and Flood Warning Centre (NWFWC) in Thimphu. [The total project cost is INR/Nu. 331.7 million (33.17 crores).]

(vii) Digital Technology for Teaching-Learning at eight RUB Colleges: INR/Nu. 87.6 million (8.76 crores). [The total project cost is INR/Nu. 290 million (29 crores).]

(viii) Digital Skilling Programme (Digital Drukyul): INR/Nu. 88.3 million (8.83 crores) covering around 1,00,00 citizens across all Gewogs. [The total project cost is INR/Nu. 290 million (29 crores).]

(ix) Development of physical infrastructure and facilities at Royal Institute of Management, Thimphu: INR/Nu. 82.9 million (8.29 crores). [The total project cost is INR/Nu. 200 million (20 crores).]

(x) Thimphu District Court Construction: INR/Nu. 36.5 million (3.65 crores). [The total project cost is INR/Nu. 334 million (33.4 crores).]

(xi) Renovation of Gelephu General Hospital: INR/Nu. 16.638 million (1.6638 crores). [The total project cost is INR/Nu. 411 million (41.1 crores).]

(xii) ProgrammeGrant (9th tranche of direct budgetary support to Royal Government of Bhutan): INR/Nu. 250 million (25 crores).

(xiii) Infrastructure Development for Dratshang: INR/Nu. 299.20 million (29.92 crores). [The total project cost is INR/Nu. 836.3 million (83.63 crores).]

(xiv) Establishment of the Selwa Center-Bhutan's First Dedicated Center for persons with disabilities: INR/Nu. 44.25 million (4.425 crores). [The total project cost is INR/Nu. 300 million (30 crores).]

(xv) Construction of Khuru Kuenphen bridge on Bajo-Khuru SNH: INR/Nu. 16.30 million (1.630 crores). [With this, the entire project cost of INR/Nu. 226.4 million (22.64 crores) is disbursed.]

3. The Coordination Meeting recalled the fifth Plan Talks led by the two Foreign Secretaries on 30 July and meetings of the External Affairs Minister on 16-17 September which appreciated implementation of India’s support for the 13th Five Year Plan and ongoing projects. The Coordination Meeting reviewed progress and implementation aspects of the following Government of India-supported projects:

(i) Replacement/Reconstruction of existing major bridges on highways: 11 new bridges- Gektong Zam, Pakhadrang Zam, Revidrang Zam, Rollong Zam, Golingpong Zam, Chableychu Zam, Dramzang Zam (completed), Chumpathang Zam, Kuchidiana Zam, Tsangchuthama Zam and Choralum Zam are being constructed at a total project cost of INR/Nu. 1.08 billion (108 crores).

(ii) Development of Central Schools (37 schools, including 20 Central Schools and 17 cluster schools) covering infrastructure development and improvement, technological upgrades, green energy initiatives, and improvement of sporting facilities at a total project cost of INR/Nu. 6 billion (600 crores).

(iii) Accelerate e-mobility Uptake in Bhutan to procure 100 electric cars as official vehicles and 45 electric buses for public transport at a total project cost of INR/Nu. 1.21 billion (121 crores).

(iv) Construction of Government Offices: New offices for all ministries are to be constructed across two locations in Thimphu. The total project cost is INR/Nu. 1.63 billion (163 crores).

(v) Support to solar and wind projects covering installation of Distributed Energy Resource Systems (DERS) at College of Science and Technology, Phuentsholing, Jigme Namgyel Engineering College, Dewathang, and Jigme Wangchuck Power Training Institute, Gelephu; last mile electrification through solar energy in Trashiyangtse, Lunana and Lhuentse Dzongkhags; supply of 25 solar water heating systems; construction of 5 greenhouse solar dryers; Green Hydrogen Demonstration Project (1MW) in Thimphu; feasibility assessment for utility-scale solar and wind projects; and skill development training in wind and solar energy. The total project allocation is INR/Nu. 1 billion (100 crores).

(vi) Multi-Disciplinary Super Speciality Hospital (MDSSH): A 200-bed cancer hospital alongside a 430-bedded inpatient/outpatient department at the existing Jigme Dorji Wangchuck National Referral Hospital (JDWNRH) and Thimphu General Hospital upon successful commissioning of MDSSH. The allocation for the project in 13th FYP is INR/Nu. 4 billion (400 crores).

(vii) Human Resource Development and Skilling Programmes by Ministry of Education and Skills Development (MoESD) with an allocation of INR/Nu. 183 million (18.3 crores) for in-service skilling programmes for tourism, construction, agriculture, production, ICT, city bus service, Bhutan Post and student-faculty exchange programme for RUB colleges.

*****

12 October 2026
Thimphu

image image image image image image image image image image
  • Terms & Conditions
  • Privacy Policy
  • Copyright Policy
  • Hyperlinking Policy
  • Accessibility Statement
  • Help
  • Safe to Host
twitter Facebook YouTube Instagram

Embassy of India Thimphu, Bhutan All Rights Reserved.

Visitors : 7774086   |    Page last updated on October 12, 2026


Powered by: Ardhas Technology India Private Limited.